Está en la página 1de 1

TRAMO: PTE. STA ROSA - PTE.

MONTALVO

CRONOGRAMA ESTIMADO DE DESEMBOLSOS


enero

DURACION DEL PROYECTO


inicio
OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
MANTENIMIENTO DE TRANSITO
MOVIMIENTO DE TIERRAS
DEMOLICION DE ESTRUCTURAS
DEMOLICION DE PAVIMENTO ASFALTICO
REMOCION DE POSTES Y SEALES EXISTETNES
LIMPIEZA DE BERMAS
SUBBASES Y BASES
BASE GRANULAR PARA BERMAS
ESCARIFICADO Y CONFORMACION DE BERMAS
PERFILADO Y COMPACTACION DE BASE
PAVIMENTOS
IMPRIMACION EN CALZADA
IMPRIMACION DE BERMAS
RIEGO DE LIGA
TRATAMIENTO SUPERFICIAL BICAPA EN BERMAS
BASE ESTABILIZADA
CARPETA ASFALTICA 100 mm
CAPA NIVELANTE
MICROPAVIMENTO EN CALIENTE CON ASFALTO MODIFICADO CON POLIMERO SBS
CEMENTO ASFALTICO
CEMENTO ASFALTICO MODIFICADO CON POLIMEROS
EMULSION CATIONICA DE ROTURA RAPIDA CRS - 2
EMULSION ASFALTICA DE ROTURA LENTA CSS -1h
EMULSION MODIFICADA DE ROTURA RAPIDA CRS-2p
ASFALTO DILUIDO TIPO MC 30
FILLER
ADITIVO MEJORADOR DE ADHERENCIA
SELLADO DE FISURAS MODERADAS
SELLADO DE FISURAS SEVERAS
PARCHADO PROFUNDO
BACHEO SUPERFICIAL
BACHEO DE BERMAS
OBRAS DE ARTE Y DRENAJE
EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS
LIMPIEZA DE ALCANTARILLAS
LIMPIEZA DE CAUCES
REPOSICION DE ALA DE ALCANTARILLA
RELLENO PARA ESTRUCTURAS
MUROS DE SUELO REFORZADO
MURO DE SACO DE ARENA
MURO DE MAMPOSTERIA DE PIEDRA
GAVION TIPO CAJA
TRANSPORTE
TRANSPORTE DE MATERIAL A OBRA HASTA 1 KM
TRANSPORTE DE MATERIAL A OBRA DESPUES 1 KM
ELIMINACION MATERIAL EXCEDENTE D < 1 Km
ELIMINACION MATERIAL EXCEDENTE D > 1 Km
TRANSPORTE DE MEZCLA ASFALTICA D<=1 KM
TRANSPORTE DE MEZCLA ASFALTICA D>1 KM
SEALIZACION
SEAL PREVENTIVA 0.75 X 0.75 m
SEAL REGLAMENTARIA
SEAL INFORMATIVA
PANEL DE SEAL
CIMENTACION DE SEAL
POSTE DE SEAL
POSTES DELINEADORES
TACHAS REFLECTIVAS
MARCAS EN EL PAVIMENTO
POSTE DE CONCRETO PARA SEAL PREVENTIVA
GUARDAVIAS NUEVAS (inc. Terminal)
REPOSICION DE PANELES DE SEALES
REPOSICION DE PANEL DE SEAL PREVENTIVA 0.75 X 0.75 m
REPOSICION DE PANEL DE SEAL REGLAMENTARIA (RESTRICTIVA) 0.80 X 1.20 m
REPOSICION DE PANEL DE SEAL INFORMATIVA
MANTENIMIENTO DE SEALES
MANTENIMIENTO DE PANEL DE SEAL PREVENTIVA 0.75 X 0.75 m
MANTENIMIENTO DE PANEL DE SEAL REGLAMENTARIA (RESTRICTIVA) 0.80 X 1.20 m
MANTENIMIENTO DE PANEL DE SEAL INFORMATIVA
MANTENIMIENTO DE POSTE DE ACERO
MANTENIMIENTO DE POSTE DE CONCRETO
MANTENIMIENTO DE GUARDAVIAS
MANTENIMIENTO DE POSTES DELINEADORES
IMPACTO AMBIENTAL
ACONDICIONAMIENTO DE MATERIAL EXCEDENTE
CLAUSURA DE SILOS Y RELLENOS SANITARIOS
REMOCION Y READECUACION DE SUPERFICIE
REACONDICIONAMIENTO DE AREAS
TALLERES
MATERIAL DIDACTICO
FIN DE LA OBRA
Total

febrero

500,240.24 S.
104,721.03 S.
90.17 S.
17,631.29 S.
88.48 S.
49,073.66 S.

101,109.96 S.

marzo

abril

111,943.17 S.

mayo

junio

julio

agosto

septiembre

octubre

noviembre

diciembre

Total

500,240.24 S.
361,107.00 S.

43,332.84 S.

90.17 S.
17,631.29 S.
88.48 S.
68,703.12 S.

19,629.46 S.

31,489.72 S.
1,859.05 S.
46,984.47 S.

31,489.72 S.
1,859.05 S.
46,984.47 S.

9,203.14 S.
3,600.14 S.

9,203.14 S.
3,600.14 S.
674,782.69 S.
765,221.04 S.
926,284.80 S.
212,168.80 S.
1,056,308.68 S.
5,313,618.98 S.
1,473,138.44 S.
11,517,660.72 S.
1,119,336.69 S.
4,207,338.24 S.
1,872,735.54 S.
39,319.58 S.
716,678.78 S.
241,497.80 S.
179,652.49 S.
393,106.16 S.
60,457.04 S.
17,423.88 S.
14,001.84 S.

87,721.75 S.
320,001.53 S.
617,523.20 S.
212,168.80 S.

468,086.25 S.
2,243,913.73 S.
243,455.62 S.

104,591.32 S.
431,306.40 S.
308,761.60 S.

630,898.86 S.
1,963,424.51 S.
290,274.01 S.

101,217.40 S.
13,913.11 S.

104,591.32 S.

101,217.40 S.

104,591.32 S.

70,852.18 S.

528,154.34 S.
265,680.95 S.
631,345.05 S.
575,883.04 S.
20,351.58 S.

528,154.34 S.
823,610.94 S.
841,793.39 S.
1,785,237.41 S.

797,042.85 S.

823,610.94 S.

823,610.94 S.

797,042.85 S.

823,610.94 S.

159,408.57 S.

1,727,649.11 S.

1,785,237.41 S.

1,785,237.41 S.

1,727,649.11 S.

1,785,237.41 S.

345,529.82 S.

280,910.33 S.

290,274.01 S.

280,910.33 S.

290,274.01 S.

196,637.23 S.

35,833.94 S.
12,074.89 S.

111,085.21 S.
37,432.16 S.

107,501.82 S.
36,224.67 S.

111,085.21 S.
37,432.16 S.

111,085.21 S.
37,432.16 S.

107,501.82 S.
36,224.67 S.

111,085.21 S.
37,432.16 S.

21,500.36 S.
7,244.93 S.

39,319.58 S.

99,806.94 S.

7,000.92 S.
35,686.19 S.
1,327.79 S.
185.54 S.

79,845.55 S.
327,588.47 S.

65,517.69 S.
60,457.04 S.
17,423.88 S.

7,000.92 S.

43,527.36 S.
181,552.56 S.

8,183.53 S.
40,009.65 S.
26,157.93 S.
115,207.56 S.
280,821.70 S.
1,171,306.85 S.

9.77 S.
2,771.26 S.
31,155.89 S.
50,108.54 S.
48,144.00 S.
4,285.31 S.

8,719.31 S.
38,402.52 S.

91,530.60 S.

35,686.19 S.
1,327.79 S.
195.31 S.
2,771.26 S.
31,155.89 S.
50,108.54 S.
48,144.00 S.
5,356.64 S.
216,783.00 S.

3,137.02 S.
15,337.03 S.
12,207.03 S.
53,763.53 S.

4,228.16 S.
20,671.65 S.
5,231.59 S.
23,041.51 S.

1,071.33 S.
125,252.40 S.
818.35 S.
4,000.97 S.

14,041.09 S.
58,565.34 S.

42,123.26 S.
175,696.03 S.

43,527.36 S.
181,552.56 S.

43,527.36 S.
181,552.56 S.

42,123.26 S.
175,696.03 S.

43,527.36 S.
181,552.56 S.

8,424.65 S.
35,139.21 S.

3,204.74 S.
5,784.00 S.

3,204.74 S.
5,784.00 S.

30,815.98 S.
6,716.30 S.
16,768.53 S.
16,408.92 S.

185.04 S.
26,369.60 S.

30,815.98 S.
6,716.30 S.
16,768.53 S.
16,408.92 S.
152,113.50 S.
254,239.02 S.
185.04 S.
26,369.60 S.

3,711.12 S.
9,402.17 S.
1,809.90 S.

3,711.12 S.
9,402.17 S.
1,809.90 S.

425.37 S.
64.45 S.
77.81 S.
137.04 S.
41.42 S.
3,944.15 S.
167.84 S.

425.37 S.
64.45 S.
77.81 S.
137.04 S.
41.42 S.
3,944.15 S.
167.84 S.

121,690.80 S.

1,122.32 S.

8,697.97 S.

30,422.70 S.
254,239.02 S.

7,014.50 S.

16,834.79 S.
21.00 S.
17,568.00 S.
45,200.00 S.
4,500.00 S.
1,000.00 S.

21.00 S.
17,568.00 S.
3,013.33 S.

995,451.18 S.

4,896,535.31 S.

4,090,200.70 S.

2,712,446.95 S.

4,918,487.77 S.

3,315,823.70 S.

3,386,008.94 S.

3,277,530.88 S.

42,186.67 S.
4,500.00 S.
333.33 S.

666.67 S.

2,933,257.74 S.

2,983,112.31 S.

698,938.34 S.

284,661.72 S.

34,492,455.54 S.