CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA N 86298 MAYA- CARHUAZ- ANCASH

Sub proyecto

ESTRUCTURAS

Fecha

ENERO DEL 2012

Lugar

MAYA - CARHUAZ - CARHUAZ - ANCASH

N
01

PERIODO

PARTIDAS

Mes 1

Mes 2

Mes 3

Mes 4

Mes 5

ESTRUCTURAS

01.01

OBRAS PROVISIONALES

S/.

7,955.19

100.00%

01.02

TRABAJOS PRELIMINARES

S/.
P

25,201.92

25,201.92

50.00%

50.00%

01.03

SEGURIDAD Y SALUD

S/.

7,706.57

7,706.57

5,137.71

10,275.43

10,275.43

10,275.43

15.00%

15.00%

10.00%

20.00%

20.00%

20.00%

18,451.40

18,451.40

13,838.55

13,838.55

13,838.55

13,838.55

20.00%

20.00%

15.00%

15.00%

15.00%

15.00%

18,661.42

18,661.42

13,996.06

13,996.06

13,996.06

13,996.06

20.00%

20.00%

15.00%

15.00%

15.00%

15.00%

43,072.31

43,072.31

43,072.31

43,072.31

43,072.31

43,072.31

43,072.31

32,304.23

32,304.23

32,304.23

32,304.23

10.00%

10.00%

10.00%

10.00%

10.00%

10.00%

10.00%

7.50%

7.50%

7.50%

7.50%

25,160.53

25,160.53

50.00%

50.00%

57,464.76

57,464.76

01.04

MOVIMIENTO DE TIERRAS

S/.
P
E

01.05

OBRAS DE CONCRETO SIMPLE

S/.
P
E

01.06

OBRAS DE CONCRETO ARMADO

S/.
P
E

01.07

COBERTURAS

S/.
P
E

01.08

MUROS Y TABIQUES DE ALBAILERIA

S/.
P

10,269.28

10,269.28

10,269.28

10,269.28

10,269.28

10,269.28

10,269.28

10,269.28

10,269.28

10,269.28

10.00%

10.00%

10.00%

10.00%

10.00%

10.00%

10.00%

10.00%

10.00%

10.00%

72,317.85

106,378.12

67,337.65

53,341.59

53,341.59

48,379.32

56,569.57

42,573.51

10,269.28

34,383.25

AVANCE SEMANAL

33,157.11

87,891.70

87,891.70

0.00

10,275.43

0.00

PROGRAMADO

32.00%

31.90%

17.95%

16.99%

1.17%

AVANCE ACUMULADO (%) PROGRAMADO

32.00%

63.89%

81.85%

98.83%

100.00%

AVANCE MENSUAL (%)

0.00

0.00

Pgina 2

Pgina 3

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA N 86298 MAYA- CARHUAZ- ANCASH

Sub proyecto

ARQUITECTURA

Fecha

ENERO DEL 2012

Lugar

MAYA - CARHUAZ - CARHUAZ - ANCASH

N
02

PERIODO

PARTIDAS

Mes 1

Mes 2

Mes 3

Mes 4

Mes 5

ARQUITECTURA

02.01

REVOQUES, ENLUCIDOS Y MOLDURAS

S/.

10,817.85

10,817.85

10,817.85

10,817.85

10,817.85

10,817.85

7,211.90

15.00%

15.00%

15.00%

15.00%

15.00%

15.00%

10.00%

S/.

4,985.59

4,985.59

4,985.59

4,985.59

25.00%

25.00%

25.00%

25.00%

20,958.91

20,958.91

20,958.91

20,958.91

25.00%

25.00%

25.00%

25.00%

S/.

4,198.00

4,198.00

50.00%

50.00%

S/.

2,687.20

2,687.20

50.00%

50.00%

P
E

02.02

CIELO RASO

02.03

PISOS Y PAVIMENTOS

S/.
P
E

01.04

CONTRAZOCALOS

01.05

ZOCALOS

01.06

REVESTIMIENTO DE GRADAS Y ESCALERAS

S/.

597.65

597.65

50.00%

50.00%

01.07

CUBIERTAS

S/.
P

281.75
100.00%

01.08

CARPINTERIA DE MADERA

S/.
P

12,442.88

12,442.88

50.00%

50.00%

10,918.80

10,918.80

50.00%

50.00%

01.09

CARPINTERIA METALICA Y HERRERIA

S/.
P
E

Pgina 4

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA N 86298 MAYA- CARHUAZ- ANCASH

Sub proyecto

ARQUITECTURA

Fecha

ENERO DEL 2012

Lugar

MAYA - CARHUAZ - CARHUAZ - ANCASH

01.10

PERIODO

PARTIDAS

CERRAJERIA

Mes 1

Mes 2

Mes 3

Mes 4

Mes 5

S/.

1,436.02

1,436.02

50.00%

50.00%

01.11

VIDRIOS, CRISTALES Y SIMILARES

S/.

12,522.90

100.00%

01.12

PINTURA

S/.

9,224.28

9,224.28

9,224.28

9,224.28

25.00%

25.00%

25.00%

25.00%

01.13

VARIOS, LIMPIEZA Y JARDINERIA

S/.

2,984.16

2,984.16

2,984.16

2,984.16

25.00%

25.00%

25.00%

25.00%

AVANCE SEMANAL

0.00

0.00

0.00

0.00

2,984.16

0.00

0.00

0.00

2,984.16

10,817.85

36,762.35

36,762.35

47,511.09

44,245.19

10,817.85

7,211.90

49,529.04

34,021.98

9,224.28

PROGRAMADO

0.00%

0.99%

28.91%

36.34%

33.76%

AVANCE ACUMULADO (%) PROGRAMADO

0.00%

0.99%

29.89%

66.24%

100.00%

AVANCE MENSUAL (%)

9,224.28

Pgina 5

Pgina 6

Pgina 7

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA N 86298 MAYA- CARHUAZ- ANCASH

Sub proyecto

INSTALACIONES SANITARIAS

Fecha

ENERO DEL 2012

Lugar

MAYA - CARHUAZ - CARHUAZ - ANCASH

N
03

PERIODO

PARTIDAS

Mes 1

Mes 2

Mes 3

Mes 4

Mes 5

INSTALACIONES SANITARIAS

03.01

APARATOS SANITARIOS

S/.

5,903.44

100.00%

03.02

INSTALACIONES SANITARIAS

S/.

6,873.21

6,873.21

5,891.32

35.00%

35.00%

30.00%

S/.

3,522.32

3,522.32

3,522.32

3,522.32

25.00%

25.00%

25.00%

25.00%

03.03

SISTEMA DE AGUA FRIA Y CONTRAINCENDIO

AVANCE SEMANAL

0.00

0.00

0.00

0.00

10,395.53

0.00

0.00

0.00

10,395.53

0.00

0.00

0.00

9,413.64

0.00

0.00

0.00

9,425.76

0.00

PROGRAMADO

0.00%

26.23%

26.23%

23.75%

23.78%

AVANCE ACUMULADO (%) PROGRAMADO

0.00%

26.23%

52.46%

76.22%

100.00%

AVANCE MENSUAL (%)

0.00

0.00

Pgina 8

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA N 86298 MAYA- CARHUAZ- ANCASH

Sub proyecto

INSTALACIONES ELECTRICAS

Fecha

ENERO DEL 2012

Lugar

MAYA - CARHUAZ - CARHUAZ - ANCASH

N
04

PERIODO

PARTIDAS

Mes 1

Mes 2

Mes 3

Mes 4

Mes 5

INSTALACIONES ELECTRICAS

04.01

INSTALACIONES ELECTRICAS

S/.

3,781.23

3,781.23

3,241.05

35.00%

35.00%

30.00%

S/.

1,048.47

1,048.47

898.69

35.00%

35.00%

30.00%

04.02

CANALIZACIONES Y/O TUBERIAS

04.03

CAJAS DE PASE

S/.

72.92

100.00%

04.04

TABLEROS Y CUCHILLAS (LLAVES)

S/.

1,740.83

1,740.83

50.00%

50.00%

02.02

CONEXIONES ARED EXTERNA Y MEDIDORES

S/.

3,677.72

3,677.72

50.00%

50.00%

02.03

ARTEFACTOS

S/.

20,662.32

100.00%

AVANCE SEMANAL

0.00

0.00

0.00

0.00

4,829.70

0.00

0.00

0.00

6,643.45

0.00

0.00

0.00

9,558.29

0.00

0.00

0.00

24,340.04

0.00

PROGRAMADO

0.00%

10.64%

14.64%

21.07%

53.65%

AVANCE ACUMULADO (%) PROGRAMADO

0.00%

10.64%

25.29%

46.35%

100.00%

AVANCE MENSUAL (%)

0.00

0.00

Pgina 9

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

CONSTRUCCIN Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA PRIMARIA N 86981, EN EL CASERO DE PACCHANGA DEL DISTRITO DE CHAVN DE HUANTAR, HUARI, ANCASH

Sub proyecto

CONSTRUCCION DE COMEDOR Y COCINA

Fecha

NOVIEMBRE DEL 2011

Lugar

PACCHANGA-CHAVIN DE HUANTAR-HUARI-ANCASH

N
01

PERIODO

PARTIDAS

Mes 1

Mes 2

Mes 3

ESTRUCTURAS

01.01

TRABAJOS PRELIMINARES

S/.

151.69

151.69

50.00%

50.00%

01.02

MOVIMIENTO DE TIERRAS

S/.

650.65

650.65

650.65

650.65

25.00%

25.00%

25.00%

25.00%

S/.

1,805.09

1,805.09

1,805.09

1,805.09

25.00%

25.00%

25.00%

25.00%

01.03

OBRAS DE CONCRETO SIMPLE

E
01.04

01.04.01

CONCRETO ARMADO

ZAPATAS

S/.

132.62

132.62

50.00%

50.00%

01.04.02

VIGA DE CIMENTACION

S/.

1,105.56

1,105.56

50.00%

50.00%

S/.

1,348.84

1,348.84

1,798.45

30.00%

30.00%

40.00%

01.04.03

COLUMNAS

01.04.04

VIGAS

S/.

1,498.72

1,498.72

1,998.29

30.00%

30.00%

40.00%

01.05

ESTRUCTURAS DE MADERA Y COBERTURA

S/.

2843.74

2843.74

50.00%

50.00%

Mes 4

Mes 5

Pgina 10

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

CONSTRUCCIN Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA PRIMARIA N 86981, EN EL CASERO DE PACCHANGA DEL DISTRITO DE CHAVN DE HUANTAR, HUARI, ANCASH

Sub proyecto

CONSTRUCCION DE COMEDOR Y COCINA

Fecha

NOVIEMBRE DEL 2011

Lugar

PACCHANGA-CHAVIN DE HUANTAR-HUARI-ANCASH

N
02

PERIODO

PARTIDAS

Mes 1

Mes 2

Mes 3

Mes 4

ARQUITECTURA

02.01

MUROS Y TABIQUES DE ALBAILERIA

S/.

3287.83

3287.83

50.00%

50.00%

02.02

REVOQUES, ENLUCIDOS Y MOLDURAS

02.03

CIELORRASOS

S/.

2415.03

2415.03

50.00%

50.00%

S/.

1131.45

1131.45

50.00%

50.00%

02.04

02.05

PISOS Y PAVIMENTOS

CONTRAZOCALOS

S/.

1415.92

1415.92

50.00%

50.00%

S/.

1258.41

100.00%

02.06

CARPINTERIA DE MADERA

S/.

1,276.63

1,276.63

50.00%

50.00%

02.07

CERRAJERIA

S/.
P

947.06
100.00%

02.08

VIDRIOS, CRISTALES Y SIMILARES

S/.
P
E

558.89
100.00%

Mes 5

Pgina 11

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

CONSTRUCCIN Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA PRIMARIA N 86981, EN EL CASERO DE PACCHANGA DEL DISTRITO DE CHAVN DE HUANTAR, HUARI, ANCASH

Sub proyecto

CONSTRUCCION DE COMEDOR Y COCINA

Fecha

NOVIEMBRE DEL 2011

Lugar

PACCHANGA-CHAVIN DE HUANTAR-HUARI-ANCASH

02.09

PERIODO

PARTIDAS

PINTURA

Mes 1

Mes 2

Mes 3

Mes 4

Mes 5

S/.

787.61

787.61

675.10

35.00%

35.00%

30.00%

03

INSTALACIONES ELECTRICAS

03.01

INSTALACIONES

S/.

394.26

459.97

459.97

30.00%

35.00%

35.00%

03.02

ARTEFACTOS DE ILUMINACION

S/.

551.88

100.00%

03.03

TABLEROS

S/.

104.19

100.00%

04

INSTALACIONES SANITARIAS

04.01

SISTEMA DE DESAGUE

S/.

213.71

213.71

284.94

30.00%

30.00%

40.00%

04.02

SISTEMA DE AGUA FRIA

S/.

107.82

107.82

143.76

30.00%

30.00%

40.00%

S/.

1112.20

1112.20

1482.94

30.00%

30.00%

40.00%

04.03

SISTEMA DE EVACUACION PLUVIAL

04.04

APARATOS Y ACCESORIOS SANITARIOS

S/.

208.73

208.73

278.31

30.00%

30.00%

40.00%

Pgina 12

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

CONSTRUCCIN Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA PRIMARIA N 86981, EN EL CASERO DE PACCHANGA DEL DISTRITO DE CHAVN DE HUANTAR, HUARI, ANCASH

Sub proyecto

CONSTRUCCION DE COMEDOR Y COCINA

Fecha

NOVIEMBRE DEL 2011

Lugar

PACCHANGA-CHAVIN DE HUANTAR-HUARI-ANCASH

PERIODO

PARTIDAS

05

PRUEBAS DE LABORATORIO

05.01

PRUEBAS DE CALIDAD DE CONCRETO

Mes 1

Mes 2

S/.

225.95

225.95

50.00%

50.00%

Mes 3

Mes 4

Mes 5

06

FLETE TERRESTRE

06.01

FLETE TERRESTRE COMEDOR

AVANCE SEMANAL

S/.

750.00

750.00

750.00

750.00

750.00

750.00

500.00

P
E

15.00%

15.00%

15.00%

15.00%

15.00%

15.00%

10.00%

901.69

3,338.35

8,556.51

8,197.95

4,424.80

2,248.72

7,257.06

5,653.03

5,595.59

1,131.45

1,415.92

1,875.89

3,669.09

4,425.04

0.00

459.97

3,477.56

1,443.68

PROGRAMADO

32.43%

30.25%

15.47%

13.21%

8.64%

AVANCE ACUMULADO (%) PROGRAMADO

32.43%

62.67%

78.15%

91.36%

100.00%

AVANCE MENSUAL (%)

675.10

0.00

Pgina 13

Pgina 14

Pgina 15

Pgina 16

Pgina 17

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

CONSTRUCCIN Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA PRIMARIA N 86981, EN EL CASERO DE PACCHANGA DEL DISTRITO DE CHAVN DE HUANTAR, HUARI, ANCASH

Sub proyecto

SERVICIOS HIGIENICOS

Fecha

NOVIEMBRE DEL 2011

Lugar

PACCHANGA-CHAVIN DE HUANTAR-HUARI-ANCASH

N
01

PERIODO

PARTIDAS

Mes 1

Mes 2

Mes 3

Mes 4

ESTRUCTURAS

01.01

TRABAJOS PRELIMINARES

S/.

104.62

104.62

50.00%

50.00%

01.02

MOVIMIENTO DE TIERRAS

S/.

532.17

532.17

532.17

532.17

25.00%

25.00%

25.00%

25.00%

S/.

1,453.52

1,453.52

1,453.52

1,453.52

25.00%

25.00%

25.00%

25.00%

S/.

1,189.79

1,189.79

50.00%

50.00%

01.03

OBRAS DE CONCRETO SIMPLE

E
01.04

01.04.01

CONCRETO ARMADO

VIGA DE CIMENTACION

01.04.02

COLUMNAS

S/.

1,521.05

1,521.05

2,028.06

30.00%

30.00%

40.00%

01.04.03

VIGAS

S/.

748.52

748.52

998.03

30.00%

30.00%

40.00%

01.05

ESTRUCTURAS DE MADERA Y COBERTURA

S/.

4268.95

4268.95

50.00%

50.00%

02

ARQUITECTURA

02.01

MUROS Y TABIQUES DE ALBAILERIA

S/.

2283.20

2283.20

1957.03

35.00%

35.00%

30.00%

Mes 5

Pgina 18

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

CONSTRUCCIN Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA PRIMARIA N 86981, EN EL CASERO DE PACCHANGA DEL DISTRITO DE CHAVN DE HUANTAR, HUARI, ANCASH

Sub proyecto

SERVICIOS HIGIENICOS

Fecha

NOVIEMBRE DEL 2011

Lugar

PACCHANGA-CHAVIN DE HUANTAR-HUARI-ANCASH

PERIODO

PARTIDAS

02.02

REVOQUES, ENLUCIDOS Y MOLDURAS

02.03

PISOS Y PAVIMENTOS

Mes 1

Mes 2

Mes 3

Mes 4

S/.

1552.51

1552.51

2070.02

30.00%

30.00%

40.00%

S/.

565.91

565.91

754.54

30.00%

30.00%

40.00%

S/.

1299.18

1299.18

50.00%

50.00%

Mes 5

02.04

02.05

CONTRAZOCALOS

CARPINTERIA DE MADERA

S/.

3861.47

100.00%

02.06

CERRAJERIA

S/.

1,243.44

100.00%

02.07

VIDRIOS, CRISTALES Y SIMILARES

S/.

213.70

100.00%

02.08

PINTURA

S/.

2,440.96

100.00%

03

INSTALACIONES SANITARIAS

03.01

SISTEMA DE DESAGUE

S/.

555.23

647.77

647.77

30.00%

35.00%

35.00%

Pgina 19

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

CONSTRUCCIN Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA PRIMARIA N 86981, EN EL CASERO DE PACCHANGA DEL DISTRITO DE CHAVN DE HUANTAR, HUARI, ANCASH

Sub proyecto

SERVICIOS HIGIENICOS

Fecha

NOVIEMBRE DEL 2011

Lugar

PACCHANGA-CHAVIN DE HUANTAR-HUARI-ANCASH

03.02

PERIODO

PARTIDAS

SISTEMA DE AGUA FRIA

Mes 1

Mes 2

Mes 3

Mes 4

Mes 5

S/.

1280.16

100.00%

03.03

SISTEMA DE EVACUACION PLUVIAL

S/.

3411.11

100.00%

03.03

APARATOS Y ACCESORIOS SANITARIOS

S/.

2699.80

100.00%

04

INSTALACIONES ELECTRICAS

04.01

INSTALACIONES

S/.

416.44

416.44

555.25

30.00%

30.00%

40.00%

04.02

ARTEFACTOS DE ILUMINACION

S/.

181.55

181.55

242.06

30.00%

30.00%

40.00%

04.03

TABLEROS

S/.
P
E

05

PRUEBAS DE LABORATORIO

05.01

PRUEBAS DE CALIDAD DE CONCRETO

S/.
P
E

90.38

90.38

135.57

135.57

20.00%

20.00%

30.00%

30.00%

31.26

31.26

41.68

30.00%

30.00%

40.00%

Pgina 20

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

CONSTRUCCIN Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA PRIMARIA N 86981, EN EL CASERO DE PACCHANGA DEL DISTRITO DE CHAVN DE HUANTAR, HUARI, ANCASH

Sub proyecto

SERVICIOS HIGIENICOS

Fecha

NOVIEMBRE DEL 2011

Lugar

PACCHANGA-CHAVIN DE HUANTAR-HUARI-ANCASH

PERIODO

PARTIDAS

06

FLETE TERRESTRE

06.01

FLETE TERRESTRE DE SERVICIOS HIGIENICOS

AVANCE SEMANAL

Mes 1

Mes 2

Mes 3

Mes 4

Mes 5

S/.

750.00

750.00

750.00

750.00

750.00

750.00

500.00

P
E

15.00%

15.00%

15.00%

15.00%

15.00%

15.00%

10.00%

854.62

4,015.86

4,786.90

3,506.74

3,766.77

1,498.52

5,266.98

4,959.75

2,735.69

2,283.20

4,401.61

6,022.38

5,502.97

8,388.81

0.00

647.77

1,338.99

7,391.07

PROGRAMADO

19.54%

23.00%

22.92%

21.58%

12.96%

AVANCE ACUMULADO (%) PROGRAMADO

19.54%

42.54%

65.46%

87.04%

100.00%

AVANCE MENSUAL (%)

0.00

0.00

Pgina 21

Pgina 22

Pgina 23

Pgina 24

Pgina 25

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

CONSTRUCCIN Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA PRIMARIA N 86981, EN EL CASERO DE PACCHANGA DEL DISTRITO DE CHAVN DE HUANTAR, HUARI, ANCASH

Sub proyecto

CERCO PERIMETRICO Y MURO DE CONTENCION

Fecha

NOVIEMBRE DEL 2011

Lugar

PACCHANGA-CHAVIN DE HUANTAR-HUARI-ANCASH

N
01

CERCO PERIMETRICO

01.01

ESTRUCTURAS

01.01.01

PERIODO

PARTIDAS

TRABAJOS PRELIMINARES

Mes 1

Mes 2

Mes 3

S/.

2,072.88

2,072.88

50.00%

50.00%

Mes 4

Mes 5

01.01.02

MOVIMIENTO DE TIERRAS

S/.

4,169.96

4,169.96

4,169.96

4,169.96

25.00%

25.00%

25.00%

25.00%

16,921.31

16,921.31

16,921.31

16,921.31

25.00%

25.00%

25.00%

25.00%

01.01.03

OBRAS DE CONCRETO SIMPLE

S/.
P
E

01.01.04

OBRAS DE CONCRETO ARMADO

S/.

5080.99

5080.99

5080.99

5080.99

5080.99

5080.99

3387.33

15.00%

15.00%

15.00%

15.00%

15.00%

15.00%

10.00%

S/.

4387.64

4387.64

4387.64

4387.64

5850.18

5850.18

15.00%

15.00%

15.00%

15.00%

20.00%

20.00%

01.02

01.02.01

ARQUITECTURA

ALBAILERIA

01.02.02

CARPINTERIA METALICA

01.02.03

PINTURA

S/.

4032.42

100.00%

S/.
P
E

32.17

32.17

42.89

30.00%

30.00%

40.00%

Pgina 26

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

CONSTRUCCIN Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA PRIMARIA N 86981, EN EL CASERO DE PACCHANGA DEL DISTRITO DE CHAVN DE HUANTAR, HUARI, ANCASH

Sub proyecto

CERCO PERIMETRICO Y MURO DE CONTENCION

Fecha

NOVIEMBRE DEL 2011

Lugar

PACCHANGA-CHAVIN DE HUANTAR-HUARI-ANCASH

01.02.04

PERIODO

PARTIDAS

JUNTAS

Mes 1

Mes 2

Mes 3

Mes 4

Mes 5

S/.

452.99

452.99

50.00%

50.00%

02

MURO DE CONTENCION

02.01

ESTRUCTURAS

02.01.01

02.01.02

02.01.03

TRABAJOS PRELIMINARES

MOVIMIENTO DE TIERRAS

OBRAS DE CONCRETO SIMPLE

S/.

375.37

100.00%

S/.

7418.42

7418.42

50.00%

50.00%

S/.
P

20,004.16

20,004.16

50.00%

50.00%

03

SISTEMA DE DRENAJE

3.01

TUBERIA Y ACCESORIOS

S/.

1541.54

1798.46

1798.46

30.00%

35.00%

35.00%

04

PRUEBAS DE LABORATORIO

04.01

PRUEBAS DE CALIDAD DE CONCRETO

S/.

225.95

225.95

50.00%

50.00%

Pgina 27

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

CONSTRUCCIN Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA PRIMARIA N 86981, EN EL CASERO DE PACCHANGA DEL DISTRITO DE CHAVN DE HUANTAR, HUARI, ANCASH

Sub proyecto

CERCO PERIMETRICO Y MURO DE CONTENCION

Fecha

NOVIEMBRE DEL 2011

Lugar

PACCHANGA-CHAVIN DE HUANTAR-HUARI-ANCASH

PERIODO

PARTIDAS

05

FLETE TERRESTRE

05.01

FLETE TERRESTRE CERCO

AVANCE SEMANAL

Mes 1

Mes 2

Mes 3

Mes 4

S/.

4500.00

4500.00

4500.00

4500.00

P
E

25.00%

25.00%

25.00%

25.00%

0.00

0.00

0.00

0.00

6,572.88

4,500.00

5,080.99

6,622.53

35,683.88

48,513.84

50,790.00

11,720.08

39,092.32

9,468.63

Mes 5

9,237.51

7,648.64

485.16

32.17

PROGRAMADO

0.00%

9.67%

62.30%

27.79%

0.24%

AVANCE ACUMULADO (%) PROGRAMADO

0.00%

9.67%

71.97%

99.76%

100.00%

AVANCE MENSUAL (%)

42.89

0.00

Pgina 28

Pgina 29

Pgina 30

Pgina 31

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

CONSTRUCCIN Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA PRIMARIA N 86981, EN EL CASERO DE PACCHANGA DEL DISTRITO DE CHAVN DE HUANTAR, HUARI, ANCASH

Sub proyecto

MOBILIARIOS

Fecha

NOVIEMBRE DEL 2011

Lugar

PACCHANGA-CHAVIN DE HUANTAR-HUARI-ANCASH

N
01

PERIODO

PARTIDAS

Mes 1

Mes 2

Mes 3

Mes 4

Mes 5

MOBILIARIO ESCOLAR

01.01

MOBILIARIO PARA AULAS Y DIRECCION

S/.

8,576.97

8,576.97

50.00%

50.00%

S/.

2,406.25

2,406.25

50.00%

50.00%

S/.

3,472.13

3,472.13

50.00%

50.00%

S/.

1,500.00

1,500.00

50.00%

50.00%

01.02

MOBILIARIO PARA BIBLIOTECA

01.03

EQUIPOY MOBILIARIO PARA COCINA

01.04

FLETES

AVANCE SEMANAL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15,955.35

15,955.35

PROGRAMADO

0.00%

0.00%

0.00%

0.00%

100.00%

AVANCE ACUMULADO (%) PROGRAMADO

0.00%

0.00%

0.00%

0.00%

100.00%

AVANCE MENSUAL (%)

0.00

Pgina 32

Pgina 33

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

CONSTRUCCIN Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA PRIMARIA N 86981, EN EL CASERO DE PACCHANGA DEL DISTRITO DE CHAVN DE HUANTAR, HUARI, ANCASH

Sub proyecto

CONSTRUCCION DE LOSA MULTIFUNCIONAL, PATIO DE HONOR Y GRADERIA

Fecha

NOVIEMBRE DEL 2011

Lugar

PACCHANGA-CHAVIN DE HUANTAR-HUARI-ANCASH

N
01

LOSA MULTIFUNCIONAL

01.01

ESTRUCTURAS

01.01.01

PERIODO

PARTIDAS

TRABAJOS PRELIMINARES

Mes 1

Mes 2

Mes 3

Mes 4

S/.

9,729.21

9,729.21

50.00%

50.00%

Mes 5

01.01.02

MOVIMIENTO DE TIERRAS

S/.

7,514.73

7,514.73

7,514.73

7,514.73

25.00%

25.00%

25.00%

25.00%

01.01.03

OBRAS DE CONCRETO SIMPLE

S/.

7,894.94

7,894.94

7,894.94

25.00%

25.00%

25.00%

01.02

01.02.01

ESTRUCTURAS

TRABAJOS PRELIMINARES

S/.

401.44

401.44

344.09

35.00%

35.00%

30.00%

01.02.02

MOVIMIENTO DE TIERRAS

01.02.03

OBRAS DE CONCRETO SIMPLE

S/.

759.28

759.28

1012.37

30.00%

30.00%

40.00%

S/.

4503.28

4503.28

6004.37

30.00%

30.00%

40.00%

01.02.04

VARIOS

S/.

383.94

383.94

511.92

30.00%

30.00%

40.00%

Pgina 34

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

CONSTRUCCIN Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA PRIMARIA N 86981, EN EL CASERO DE PACCHANGA DEL DISTRITO DE CHAVN DE HUANTAR, HUARI, ANCASH

Sub proyecto

CONSTRUCCION DE LOSA MULTIFUNCIONAL, PATIO DE HONOR Y GRADERIA

Fecha

NOVIEMBRE DEL 2011

Lugar

PACCHANGA-CHAVIN DE HUANTAR-HUARI-ANCASH

N
03

GRADERIAS

03.01

ESTRUCTURAS

03.01.01

PERIODO

PARTIDAS

TRABAJOS PRELIMINARES

Mes 1

Mes 2

Mes 3

Mes 4

Mes 5

S/.

68.03

03.01.02

MOVIMIENTO DE TIERRAS

100.00%

S/.

976.43

03.01.03

OBRAS DE CONCRETO SIMPLE

100.00%

S/.

2,050.37

2,050.37

50.00%

50.00%

04

FLETE TERRESTRE

04.01

FLETE TERRESTRE LOSA

AVANCE SEMANAL

S/.

2100.00

1800.00

1800.00

P
E

35.00%

30.00%

30.00%

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

PROGRAMADO

#REF!

#REF!

#REF!

#REF!

#REF!

AVANCE ACUMULADO (%) PROGRAMADO

#REF!

#REF!

#REF!

#REF!

#REF!

AVANCE MENSUAL (%)

#REF!

Pgina 35

Pgina 36

Pgina 37

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

MEJORAMIENTO EN LA INFRAESTRUCTURA EDUCATIVA DE LA I.E.P. N 86842 DEL CENTRO POBLADO DE SAN MIGUEL, DISTRITO DE PONT- HUARI- ANCASH

Sub proyecto

SERVICIOS HIGIENICOS

Fecha

DICIEMBRE DEL 2010

Lugar

ANCASH - HUARI - PONTO - SAN MIGUEL

PERIODO

PARTIDAS

Mes 1

Mes 2

Mes 3

Mes 4

ESTRUCTURA DE SERVICIOS HIGIEN ICOS

01

01.01

OBRAS PRELIMINARES

S/.
P

56.32

56.32

56.32

56.32

25.00%

25.00%

25.00%

25.00%

01.02

MOVIMIENTO DE TIERRAS

S/.

976.07

976.07

976.07

976.07

25.00%

25.00%

25.00%

25.00%

S/.

1,870.01

1,870.01

1,870.01

1,870.01

25.00%

25.00%

25.00%

25.00%

S/.

1,489.33

1,489.33

50.00%

50.00%

S/.

4,223.26

4,223.26

50.00%

50.00%

01.03

01 03.01

CONCRETO SIMPLE

CIMIENTOS Y SOBRECIMIENTOS

01.04

01.04.01

CONCRETO ARMADO

COLUMNAS

01.04.02

VIGAS

S/.

2,187.49

2,187.49

50.00%

50.00%

01.04.03

ESTRUCTURA DE MADERA Y COBERTURA

ARQUITECTURA DE SERVICIOS HIGIENICOS

02

02.01

ALBAILERIA

S/.

3168.36

3168.36

50.00%

50.00%

Pgina 38

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

MEJORAMIENTO EN LA INFRAESTRUCTURA EDUCATIVA DE LA I.E.P. N 86842 DEL CENTRO POBLADO DE SAN MIGUEL, DISTRITO DE PONT- HUARI- ANCASH

Sub proyecto

SERVICIOS HIGIENICOS

Fecha

DICIEMBRE DEL 2010

Lugar

ANCASH - HUARI - PONTO - SAN MIGUEL

02.02

PERIODO

PARTIDAS

REVOQUES, ENLUCIDOS Y MOLDURAS

Mes 1

Mes 2

Mes 3

S/.

3073.95

3073.95

2634.82

35.00%

35.00%

30.00%

Mes 4

02.03

PISOS Y PAVIMENTOS

S/.

1017.30

1017.30

50.00%

50.00%

02.04

02.05

ZOCALOS Y CONTRAZOCALOS

CARPINTERIA DE MADERA

S/.

1952.89

1952.89

50.00%

50.00%

S/.

2865.04

100.00%

02.06

CERRAJERIA

S/.

1544.74

100.00%

02.07

VIDRIOS, CRSITALES Y SIMILARES

S/.
P

130.28
100.00%

02.08

PINTURA

S/.

1,115.80

1,115.80

50.00%

50.00%

Pgina 39

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

MEJORAMIENTO EN LA INFRAESTRUCTURA EDUCATIVA DE LA I.E.P. N 86842 DEL CENTRO POBLADO DE SAN MIGUEL, DISTRITO DE PONT- HUARI- ANCASH

Sub proyecto

SERVICIOS HIGIENICOS

Fecha

DICIEMBRE DEL 2010

Lugar

ANCASH - HUARI - PONTO - SAN MIGUEL

PERIODO

PARTIDAS

Mes 1

Mes 2

Mes 3

Mes 4

INSTALACIONES SANITARIAS DE SERVICIOS HIGIENICOS

03

03.01

SISTEMA DE DESAGE

S/.

511.85

511.85

511.85

511.85

255.93

255.93

20.00%

20.00%

20.00%

20.00%

10.00%

10.00%

S/.

1434.27

1434.27

1434.27

1434.27

717.13

717.13

20.00%

20.00%

20.00%

20.00%

10.00%

10.00%

S/.

1838.97

1838.97

50.00%

50.00%

03.02

SISTEMA DE AGUA

03.03

APARATOS Y ACCESORIOS SANITARIOS

SISTEMA DE AGUA DE LLUVIA

04

04.01

SISTEMA DE AGUA DE LLUVIA

S/.

1338.86

1338.86

1338.86

1338.86

669.43

669.43

20.00%

20.00%

20.00%

20.00%

10.00%

10.00%

INSTALACIONES ELECTRICAS DE SERVICIOS HIGIENICOS

05

05.01

05.02

SALIDAS DE ALUMBRADO Y TOMACORRIENTE

POZO A TIERRA

S/.

287.58

215.69

215.69

P
E

40.00%

30.00%

30.00%

S/.

630.31

P
E

05.03

CANALIZACION Y/O TUBERIAS

S/.
P
E

100.00%

294.84

343.98

343.98

30.00%

35.00%

35.00%

Pgina 40

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

MEJORAMIENTO EN LA INFRAESTRUCTURA EDUCATIVA DE LA I.E.P. N 86842 DEL CENTRO POBLADO DE SAN MIGUEL, DISTRITO DE PONT- HUARI- ANCASH

Sub proyecto

SERVICIOS HIGIENICOS

Fecha

DICIEMBRE DEL 2010

Lugar

ANCASH - HUARI - PONTO - SAN MIGUEL

05.04

PERIODO

PARTIDAS

ARTEFACTOS DE ILUMINACION

Mes 1

Mes 2

Mes 3

S/.

771.28

P
E

05.05

POSTE DE MADERA

100.00%

S/.

350.23

P
E

05.06

VARIOS

Mes 4

100.00%

S/.

206.03

206.03

P
E

50.00%

50.00%

FLETE TERRESTRE

06

06.01

FLETE TERRESTRE

AVANCE SEMANAL

S/.

982.04

982.04

982.04

982.04

1964.09

1964.09

1964.09

P
E

10.00%

10.00%

10.00%

10.00%

20.00%

20.00%

20.00%

1,038.36

1,958.11

8,602.42

12,058.36

7,376.25

2,393.52

12,747.04

14,620.78

12,165.47

1,917.54

4,941.23

6,214.53

2,996.48

0.00

PROGRAMADO

26.57%

41.71%

28.35%

3.37%

AVANCE ACUMULADO (%) PROGRAMADO

26.57%

68.29%

96.63%

100.00%

AVANCE MENSUAL (%)

0.00

0.00

Pgina 41

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

MEJORAMIENTO EN LA INFRAESTRUCTURA EDUCATIVA DE LA I.E.P. N 86842 DEL CENTRO POBLADO DE SAN MIGUEL, DISTRITO DE PONT- HUARI- ANCASH

Sub proyecto

COMEDOR ESCOLAR Y EXTERIORES

Fecha

DICIEMBRE DEL 2010

Lugar

ANCASH - HUARI - PONTO - SAN MIGUEL

PERIODO

PARTIDAS

Mes 1

Mes 2

Mes 3

Mes 4

MODULO DE COMEDOR ESCOLAR

01
01.01

01.01.01

ESTRUCTURA DE COMEDOR ESCOLAR

OBRAS PRELIMINARES

S/.

111.63

111.63

95.68

35.00%

35.00%

30.00%

01.01.02

MOVIMIENTO DE TIERRAS

S/.

169.96

169.96

169.96

169.96

25.00%

25.00%

25.00%

25.00%

01.01.03

CONCRETO SIMPLE

01.01.03.01 CIMIENTOS Y SOBRECIMIENTOS

S/.

654.23

654.23

654.23

654.23

25.00%

25.00%

25.00%

25.00%

01.01.04

CONCRETO ARMADO

01.01.04.01 ZAPATAS

S/.

901.01

901.01

50.00%

50.00%

S/.

2,954.72

2,954.72

50.00%

50.00%

01.01.04.02 COLUMNAS

01.01.04.03 VIGAS

S/.

4,209.85

4,209.85

50.00%

50.00%

01.02

01.02.01

ARQUITECTURA DE COMEDOR ESCOLAR

ALBAILERIA

S/.

2903.52

2903.52

50.00%

50.00%

01.02.02

REVOQUES, ENLUCIDOS Y MOLDURAS

S/.

1534.70

1534.70

1315.46

35.00%

35.00%

30.00%

Pgina 42

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

MEJORAMIENTO EN LA INFRAESTRUCTURA EDUCATIVA DE LA I.E.P. N 86842 DEL CENTRO POBLADO DE SAN MIGUEL, DISTRITO DE PONT- HUARI- ANCASH

Sub proyecto

COMEDOR ESCOLAR Y EXTERIORES

Fecha

DICIEMBRE DEL 2010

Lugar

ANCASH - HUARI - PONTO - SAN MIGUEL

01.02.03

PERIODO

PARTIDAS

CIELORRASOS

Mes 1

Mes 2

Mes 3

S/.

1444.90

1444.90

50.00%

50.00%

S/.

1387.45

1387.45

50.00%

50.00%

Mes 4

01.02.04

PISOS Y PAVIMENTOS

01.02.05

VEREDAS PERIMETRALES

S/.

226.13

226.13

50.00%

50.00%

01.02.06

01.02.07

ZOCALOS Y CONTRAZOCALOS

CUBIERTAS

S/.

54.31

54.31

50.00%

50.00%

S/.

5728.82

5728.82

50.00%

50.00%

01.02.08

CARPINTERIA DE MADERA

S/.

1724.09

100.00%

01.02.09

CERRAJERIA

S/.
P

454.65
100.00%

01.02.10

VIDRIOS, CRSITALES Y SIMILARES

S/.
P

40.13
100.00%

01.02.11

PINTURA

S/.

1,126.35

1,126.35

50.00%

50.00%

Pgina 43

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

MEJORAMIENTO EN LA INFRAESTRUCTURA EDUCATIVA DE LA I.E.P. N 86842 DEL CENTRO POBLADO DE SAN MIGUEL, DISTRITO DE PONT- HUARI- ANCASH

Sub proyecto

COMEDOR ESCOLAR Y EXTERIORES

Fecha

DICIEMBRE DEL 2010

Lugar

ANCASH - HUARI - PONTO - SAN MIGUEL

N
01.03

01.03.01

PERIODO

PARTIDAS

Mes 1

Mes 2

Mes 3

Mes 4

INSTALACIONES SANITARIAS DE COMEDOR ESCOLAR

DRENAJE PLUVIAL

S/.

228.28

228.28

171.21

171.21

171.21

171.21

20.00%

20.00%

15.00%

15.00%

15.00%

15.00%

01.04

01.04.01

01.04.02

INSTALACIONES ELECTRICAS DE COMEDOR ESCOLAR

INSTALACIONES INTERIORES

LUMINARIAS

S/.

155.35

155.35

207.13

P
E

30.00%

30.00%

40.00%

S/.

620.58

P
E

05.03

POZO A TIERRA

100.00%

S/.
P
E

733.08
100.00%

PATIO DE HONOR Y AREAS VERDES

02
02.01

02.01.01

PATIO DE HONOR

OBRAS PRELIMINARES

S/.

316.08

316.08

50.00%

50.00%

02.01.02

MOVIMIENTO DE TIERRAS

S/.

184.68

184.68

184.68

184.68

25.00%

25.00%

25.00%

25.00%

S/.

2373.50

2373.50

2373.50

2373.50

25.00%

25.00%

25.00%

25.00%

02.01.03

CONCRETO EN PATIO DE HONOR

02.02

02.02.01

SARDINELES Y AREAS VERDES

OBRAS PRELIMINARES

S/.

666.55

666.55

50.00%

50.00%

02.02.02

MOVIMIENTO DE TIERRAS

S/.
P
E

41.37

41.37

35.46

35.00%

35.00%

30.00%

Pgina 44

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

MEJORAMIENTO EN LA INFRAESTRUCTURA EDUCATIVA DE LA I.E.P. N 86842 DEL CENTRO POBLADO DE SAN MIGUEL, DISTRITO DE PONT- HUARI- ANCASH

Sub proyecto

COMEDOR ESCOLAR Y EXTERIORES

Fecha

DICIEMBRE DEL 2010

Lugar

ANCASH - HUARI - PONTO - SAN MIGUEL

02.02.03

PERIODO

PARTIDAS

SARDINELES PARA JARDINERIA

Mes 1

Mes 2

Mes 3

Mes 4

S/.

1605.26

1605.26

1375.94

35.00%

35.00%

30.00%

02.02.04

AREA VERDE

S/.

277.31

277.31

277.31

277.31

25.00%

25.00%

25.00%

25.00%

CONSTRUCCION DEL PROSENIO

03

03.01

OBRAS PRELIMINARES

S/.

197.44

P
E
03.02

MOVIMIENTO DE TIERRAS

03.03

PROSCENIO

03.04

03.05

GRADERIAS

BASE PARA MASTIL

100.00%

S/.
P
E

395.57

395.57

50.00%

50.00%

S/.

1513.61

1513.61

1297.38

P
E

35.00%

35.00%

30.00%

S/.

239.00

239.00

P
E

50.00%

50.00%

S/.

12858.72

P
E

100.00%

FLETE TERRESTRE

06

06.01

FLETE TERRESTRE

AVANCE SEMANAL

S/.

1187.16

1187.16

1187.16

1187.16

3561.49

3561.49

P
E

10.00%

10.00%

10.00%

10.00%

30.00%

30.00%

13,568.52

21,467.57

0.00

0.00

0.00

2,903.52

4,202.31

1,357.13

7,630.05

11,473.13

6,150.68

5,856.56 10,162.07

2,803.82

2,928.35

PROGRAMADO

2.80%

25.82%

43.37%

28.01%

AVANCE ACUMULADO (%) PROGRAMADO

2.80%

28.62%

71.99%

100.00%

AVANCE MENSUAL (%)

13,136.03

Pgina 45

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

MEJORAMIENTO EN LA INFRAESTRUCTURA EDUCATIVA DE LA I.E.P. N 86842 DEL CENTRO POBLADO DE SAN MIGUEL, DISTRITO DE PONT- HUARI- ANCASH

Sub proyecto

EQUIPAMIENTO

Fecha

DICIEMBRE DEL 2010

Lugar

ANCASH - HUARI - PONTO - SAN MIGUEL

PERIODO

PARTIDAS

Mes 1

Mes 2

Mes 3

Mes 4

MOBILIARIO Y EQUIPAMIENTO

01

01.01

MOBILIARIO PARA AULAS

S/.

15,566.70

100.00%

01.02

MOBILIARIO PARA SALA DE PROFESORES

S/.

29,082.52

100.00%

01.03

MOBILIARIO PARA DIRECCION - SECRETARIA

S/.

6,217.80

100.00%

01.04

EQUIPAMIENTO PARA COMEDOR

S/.

1,765.11

100.00%

AVANCE SEMANAL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 52,632.13

0.00

PROGRAMADO

0.00%

0.00%

0.00%

100.00%

AVANCE ACUMULADO (%) PROGRAMADO

0.00%

0.00%

0.00%

100.00%

AVANCE MENSUAL (%)

0.00

0.00

Pgina 46

CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO


Obra

MEJORAMIENTO EN LA INFRAESTRUCTURA EDUCATIVA DE LA I.E.P. N 86842 DEL CENTRO POBLADO DE SAN MIGUEL, DISTRITO DE PONT- HUARI- ANCASH

Sub proyecto

EQUIPAMIENTO

Fecha

DICIEMBRE DEL 2010

Lugar

ANCASH - HUARI - PONTO - SAN MIGUEL

PERIODO

PARTIDAS

Mes 1

Mes 2

Mes 3

Mes 4

MOBILIARIO Y EQUIPAMIENTO

01

01.01

MOBILIARIO PARA AULAS

S/.

11,170.60

100.00%

01.02

MOBILIARIO PARA SALA DE PROFESORES

S/.

20,869.51

100.00%

01.03

MOBILIARIO PARA DIRECCION - SECRETARIA

S/.

4,461.87

100.00%

01.04

EQUIPAMIENTO PARA COMEDOR

S/.

1,266.64

100.00%

AVANCE SEMANAL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 37,768.61

0.00

PROGRAMADO

0.00%

0.00%

0.00%

100.00%

AVANCE ACUMULADO (%) PROGRAMADO

0.00%

0.00%

0.00%

100.00%

AVANCE MENSUAL (%)

0.00

0.00

Pabelln de Aulas
Servicios Higinicos
Comedor Escolar y Exteriores
Equipamiento
-------------------------------------------------Costo Directo Total
Gastos generales 10.1043 %
Utilidad 7.0 %
-------------------------------------------------SUB TOTAL
Impuesto (IGV) 19%
-------------------------------------------------TOTAL PRESUPUESTO DE OBRA:
Equipamiento
-------------------------------------------------TOTAL PRESUPUESTO DE OBRA:

485,557.63

485,557.63

89,030.09

89,030.09

103,639.74

103,639.74

-------------------

37,768.62
-------------------

678,227.46

715,996.08

68,530.14

72,346.39

47,475.92
50,119.73
------------------- ------------------794,233.51

838,462.19

150,904.37
159,307.82
------------------- ------------------945,137.88

997,770.01

52,632.13
0.00
------------------- ------------------997,770.01

997,770.01

0.71759617